THE EFFECTS OF SPECIFICATIONS OF GOODS ON PUBLIC PROCUREMENT PERFORMANCE IN TANZANIA: A CASE OF TANESCO HEADQUARTER

Main Article Content

Mr. Richard P. Benaya

Abstract

The main purpose of this study was to examine the effects of specification of goods on the performance of public procurement. Specifically, two objectives of this study include; examining user involvement in preparation of specifications; and assessing how specification affect procurement performance. The study used case study design, and the methods used for data collection were questionnaire, interview guide and reviewing of relevant documents. Data were analysed by descriptive statistics for objective one; while objective two was analysed by performing binary regression model. The study found that, only two variables (specification by technical standards and the user involvement) were determined to have significant contribution on the performance of public procurement. In other words, user involvement and specifying product by technical standards have been shown to contribute significantly towards acquisition of the right product, one of the main aspects of procurement performance. Furthermore, the study shows that right products are more likely acquired by procuring entities when end users of the product are initially involved when preparing specifications for the products. 

Issue Section: Procurement and Supply Chain Management

Article Details

References

Barringer, B. R. and Harrison, J. S. (2000). Walking a Tightrope: Creating value Through: Journal of Management 26(3), 367–403Basheka B. C. and Mugabira, M.I. (2010). Determinant of Unethical Public Procurement in Local Government Systems of Uganda, International Journal of Procurement Management, 8 (16), 8-9Baxter, R., Hastings, N., Glass, E. J. (2012). Procurement Guidance: Developing Specifications–Procurement of Animal Genetics. Australia: Purchasing Reform Group PublicationsCao, M. and Zhang, Q. (2013). Supply Chain Collaboration: Roles of Inter-organizational Systems Trust and Collaborative Culture. Theories and Theoretical Framework. 2(1), 17-22.GSA. (2018). Writing Procurement Specifications Guidelines Inter-organizational Relationships. Journal of Management, 4(14),1-9Klatt, A. F. (2015). Performance-based Specifications in Public Procurement: Exploring the Case of Germany: 5th IBA Bachelor Thesis Conference2ndJuly, 2015. The Netherland. 2-12pp. Unpublished manuscriptKusi L.Y., George A. B and Nyarku, K. M. (2014). Assessment of Public Procurement Policy Implementation in the Educational Sector: A Case Study of Takoradi Polytechnic. International Journal of Academic Research in Business and Social Sciences, 4(10),260-278. Kombo D. K and Tromp D. A (2006), Proposal and Thesis Writing2ndEdition. Nairobi: Paulines PublicationsKothari C.R. (2004). Research Methodology; Methods and Techniques, Second Revised Edition. New Delhi: New Age International Ltd. Luketero, E .V. (2016). Determinants of Procurement Performance in Commercial Banks within East Africa: Unpublished manuscript, University of Nairobi, Kenya.Magigi, W. (2015). Research Proposal Development and Report Writing, A Pathway for Sciences in Higher Learning Institutions, First Edition. Moshi, Tanzania

Otter, C. L. and Geddes, R. L. (2010). Guidelines for Writing Effective Specifications:Retrieved21stSeptember,2018From:purchasing.idaho.gov/pdf/publiccations/writing_effective_specs.pdfPPRA. (2017). Annual Performance Evaluation Report for the Financial Year 2016/2017. Accessed on 12thOctober, 2018 from www.ppra.go.tzPysdek, T. and Keller, P. (2013). Quality Engineering Management: A Complete Guide to Operational Excellence.4thEdition. New York, USA: Cataloging-in-Publication Data Roehrich, J., Selviaridis, K. & Glass, A. (2014). Performance Principles, Supply Business Reductive. London, UK: Chartered Institute of Purchasing and Supply